Pan Section Vapour Header and Pan vapour Line Dia with Online Calculator
In this article described about formulas for calculate Pan Section Vapour Header and Pan vapour Line Dia and also proved online calculator.
Pan Section Vapour Header Dia :
Required Data For Calculation:
a) Crushing Rate in TCH
b) A m/c % cane (To be taken percentage of massecuite boiled on that particular bleed vapour).
(For example while calculating the 2nd bleed vapour header for pans , choose how may pans boiled on 2nd vapour according to that consider the percentage of massecuite )
c) B m/c % cane (To be taken percentage of massecuite boiled on that particular bleed vapour).
(For example consider total B massecuite boiled on 3rd vapour bleeding than calculating the 2nd bleed vapour header for pans, choose percentage of massecuite is zero in calculator)
d) C m/c % cane (To be taken percentage of massecuite boiled on that particular bleed vapour).
e) Temperature of input vapour in oC
f) Velocity of inlet vapour in m/sec (Taken as per bleed vapour from evaporator body)
g) Specific steam consumption for A massecuite in ton of vapour per ton of m/c ( For A m/c it is having 0.4 to 0.55)
h) B massecuite Specific steam consumption in ton of vapour per ton of m/c ( For B m/c it is having 0.35 to 0.4)
i) Specific steam consumption for C massecuite in ton of vapour per ton of m/c ( For C m/c it is having 0.30 to 0.35)
j) Specific volume of vapour in M3/kg ( Taken from Steam table for the particular temperature)
Formulas for calculation:
a) Vapour requirement for massecuite boiling in Ton/hr = ( TCH x massecuite % cane x Steam consumption of vapour)/100
b) Total vapour Requirement in T/hr = ( Vapour requirement for A m/c boiling + Vapour requirement for B m/c boiling + Vapour requirement for C m/c boiling )
c) Total vapour requirement to be covert into M3/sec by the multiplying the specific volume of vapour
d) Dia of vapour Line header = SQRT [Volume of vapour / (0.785 x Velocity of vapour) ]
(SQRT – Square root)
Pan Vapour Inlet and Out Line Dia:
Required Data For Calculation:
a) Heating surface of the pan in m2
b) Evaporation rate of the pan in Kg/ m2/hr ( Take maximum value for calculating the vapour lines)
c) Pan Inlet Vapour Temperature in oC (Taken from evaporator bleed vapour temperature)
d) Pan Outlet Vapour Temperature in oC ( It is having 50oC to 60oC)
e) Inlet Vapour velocity of Pan in m/sec (Taken from evaporator bleed vapour velocity)
f) Pan Outlet Vapour Velocity in m/sec ( It is having 50 to 60 m/sec)
g) Specific volume of Pan inlet vapour ( Taken from Steam table for the particular temperature)
h) Specific volume of Pan Outlet vapour ( Taken from Steam table for the particular temperature)
As Per Hugot given Evaporation Rate of pans |
||||
Maximum | Minimum | |||
Kg/m2/hr | Lb/Ft2/hr | Kg/m2/hr | Lb/Ft2/hr | |
Footing | 85 | 17.5 | 17 | 3.5 |
A massecuite | 71 | 14.6 | 32 | 6.6 |
B massecuite | 46 | 9.4 | 11 | 2.2 |
C massecuite |
36 | 7.5 | 1.7 | 0.34 |
Formulas for calculation:
Volume of the vapour in M3/sec = (Heating surface x evaporation rate of the pan x Specific volume of vapour /3600 )
Dia of vapour Line = SQRT [Volume of vapour / (0.785 x Velocity of vapour) ]
Pan Vapour Line Dia Online Calculator
Pan Section Vapour Header Online Calculator
Related Articles:
Formulas for calculate vapour line dia for juice heater and evaporator.
Condensate Receiving Tank Design Calculation | Condensate Mound
Three and half massecuite boiling material balance calculation.
Sugar Factory Material Balance Calculation for 3 m/c Boiling.
Sugar Industry Related Important Websites | sugar Technology
Batch centrifugal machine capacity and its gravity factor by online calculator.
Hi friends Thanks for reading. I Hope you liked it. Give feed back, comments and please don’t forget to share it