Grain and molasses ratio calculation for ‘B’ continuous pan
In this article explain with example for B grain purity calculation with their required quantity of molasses. B continuous pan grain and molasses flow rate requirement according to the continuous pan capacity. Finally, calculate B continuous pan massecuite dropping purity and its vapour requirement.
Data required for B massecuite purity calculation.
S.No | Particulars | Brix | Purity | Specific Gravity |
1 | Syrup | 60 | 82 | 1.276 |
2 | AH molasses | 75 | 71 | 1.337 |
4 | Required B grain footing ( Before slurry feed) | 86 | 75 | 1.435 |
5 | B grain | 88 | ? | 1.435 |
6 | B grain batch pan capacity in metric ton(MT) | 60 | ||
7 | Graining Volume of the batch pan | 45 | % | |
8 | Grain & molasses ratio | 1 | 3 | |
9 | B continuous pan capacity | 30 | T/hr | |
10 | B massecuite Brix | 95 | ? |
Calculation part :
B Grain material purity ( For B grain taken Syrup & AH molasses as a footing material and then further fill up with AH molasses.)
S.No | Particulars | Values | UOM | Remarks |
1 | Solids in B Grain | 52.8 | MT | 88 x 60 /100 |
2 | Volume of the pan | 41.8 | M3 | 60 / 1.435 |
418 | HL | 41.8 x 10 | ||
3 | Grain Volume | 188.153 | HL | 418 x 45 % |
18.82 | M3 | 188.15 /10 | ||
4 | Weight of the grain material | 27 | MT | 18.82 / 1.435 |
5 | Solids in grain material | 23.22 | MT | 27 x 86 / 100 |
6 | Solids from Syrup for grain material | 8.4 | MT | 8.4 x 4 / 11 |
7 | Solids from AH for grain material | 14.8 | MT | 23.22 – 8.4 |
8 | Weight from Syrup for grain material | 14.07 | MT | 8.4 x 100 / 60 |
9 | Weight from AH for grain material | 19.70 | MT | 19.70 x 100 / 75 |
10 | Volume from Syrup for grain footing material | 11.03 | M3 | C26 / 1.276 |
110 | HL | 11.03 x 10 | ||
11 | Volume from AH for grain footing material | 14.74 | M3 | 19.70 / 1.337 |
147 | HL | 14.74 x 10 | ||
12 | Solids from AH to further filling of the grain material | 29.58 | MT | 52.8 – 23.22 |
13 | Weight from AH to further filling of the grain material | 39.44 | MT | 29.58 x 100 / 75 |
14 | Volume from AH to further filling of the grain material | 29.4989 | M3 | 39.44 / 1.337 |
295 | HL | 29.49 x 10 | ||
15 | Final B grain drooping purity | 72.8 | [ (29.58 x 71) + (23.22 x 75)] / 52.8 |
B grain and AH required for B Continues pan for given grain and molasses ratio and B massecuite final dropping Purity.
1 | Grain Quantity | 60 | MT | |
2 | AH molasses quantity | 180 | MT | 60 x 3 |
3 | B grain solids for B m/c | 52.80 | MT | 60 x 88 / 100 |
4 | AH solids for B m/c | 135 | MT | 180 x 75 / 100 |
5 | B M/c Production for given B grain solids | 187.80 | MT | 52.80 + 135 |
Quantity of B massecuite | 197.68 | MT | 187.80 x 100 / 95 | |
6 | Grain feed quantity for Continuous Pan | 9.11 | MT/hr | 60 x 30 / 197.68 |
6.35 | HL/hr | 9.11 / 1.435 | ||
7 | AH Molasses feed quantity for Continuous Pan | 27.32 | MT/hr | 9.11 x 3 |
204 | HL/hr | 27.32 x 10 / 1.337 | ||
8 | B massecuite Final purity | 71.49 | % | [ (52.80 x 75) + (135 x 71)] / 187.80 |
Steam Flow requirement for Continuous pan.
1 | Evaporation rate in AH | 21.05 | % | ((95 -75)/95) |
2 | Evaporation rate in B grain | 7.37 | % | (95 – 88)/95 |
6.42 | T/hr | 9.11 x 7.37% + 27.32 x 21.05% | ||
3 | Consider 20% extra | 7.71 | T/hr | 6.42 x 1.2 |
Steam Flow requirement for Continuous pan | 7.71 | T/hr |
Online Calculator for grain and molasses quantity estimation for a continuous pan with final dropping massecuite purity:
Related Topics
Three and a half massecuite boiling material balance calculation.
Three massecuite boiling solid balance calculation.
C massecuite final purity calculation |Grain Quantity requirement for C CVP.
Cocrystallization concept in sugar industry crystallization process.
Vacuum crystallizer volume calculation at different sight glass levels.
Hi friends Thanks for reading the material balance calculation. I hope you like it. Give feedback, and comments and please share it.